How are contracting and rental charges calculated?
Our all-inclusive scaffolding contracting rates are based on erected scaffold surface area or building floor area. Scaffold area is the actual developed area erected; building area is measured under the applicable codes. Rates include materials, labour, transport, dismantling and removal, and vary with height, duration and scaffold type. Material rental is charged per tonne, metre or plate per day—ringlock components per tonne per day, scaffold tubes and square steel per metre per day, and road plates per plate per day. Monthly rental periods are common. Under Regulations on Safety Management of Sub-projects and Sub-items with Greater Risks (Ministry of Housing and Urban-Rural Development Order No. 37), concrete formwork support works require a project-specific construction plan if any of the following applies: height ≥5 m, span ≥10 m, total construction load ≥10 kN/m², or concentrated line load ≥15 kN/m. Expert review is additionally required if any of the following applies: height ≥8 m, span ≥18 m, total construction load ≥15 kN/m², or concentrated line load ≥20 kN/m. Related costs are itemized separately. A detailed quotation follows review of drawings or a site survey, with the pricing basis and charges for additional work clearly stated to help avoid settlement disputes.
How soon can you mobilize to site?
Standard projects can mobilize within 3 working days: confirm requirements and qualifications → conduct a site survey (or assess drawings and images remotely for projects outside the area) and agree the preliminary proposal and quotation → after contract signing, prepare the project-specific plan, dispatch materials and mobilize the crew. For urgent projects, the planning stage may be expedited, subject to site conditions and material availability.
How are construction-safety responsibilities allocated?
We are responsible for safety within our scaffold-erection scope. We provide full-time safety officers and require all personnel to hold the relevant special-operation certificates, including those required for construction scaffolders. We arrange acceptance after erection and submit the records. The client provides suitable working conditions and coordinates overlapping operations. We hold a licence and maintain a comprehensive safety-management system.
Can you handle high-rise projects and high-level formwork support?
Yes. Our experience includes Wuxi Olympic Sports Center (Phases 1 & 2), Longhua Smart Valley, NJUST Teaching and Research Building and other large-span and high-level formwork-support projects. We can design scaffolding, calculate loads, arrange expert review and develop project-specific designs for irregular structures.
Can you undertake projects outside the Yangtze River Delta?
Yes. We serve projects nationwide, mainly in the Yangtze River Delta, with completed work in Jiangsu, Shanghai, Zhejiang, Shandong, Anhui, Jiangxi, Guangdong, Xinjiang and other areas. Cross-regional projects use materials allocated from nearby resources and crews stationed on site, under the project manager’s oversight throughout.
Who handles dismantling, demobilization and material losses?
Under a contracting arrangement, we handle dismantling and removal at the milestones agreed in the contract. Under rental-only arrangements, the client generally handles dismantling or may appoint us to do so. Material losses are settled under the agreed compensation terms. Before signing, confirm transport and loading/unloading charges, loss allowances, and whether safety nets and scaffold boards are charged separately.
Can I rent materials without construction services?
Yes. Specialist contracting and material rental can be ordered separately or combined. For rental-only orders, choose ringlock components, scaffold tubes, couplers, steel scaffold planks, metal plate mesh, square steel or steel road plates. For a full contracting service, we handle design, materials, labour, transport, erection, dismantling and removal; the client provides the work area and project schedule.
What are the minimum rental quantities and deposit terms?
Minimum rental quantities and rental periods apply. The deposit is a percentage of the material value and is fully refunded after return and inspection, provided there is no serious deformation or missing material. Long-term clients may sign an annual framework agreement with staged collection for each project and monthly settlement.